How to request Steel Rebar quotations
A copy-ready RFQ template written by a procurement engineer, plus a line-by-line explanation of why each ask matters. Free to use — no account, no attribution.
Steel Rebar RFQ template
Subject: RFQ — Steel rebar, [project name], [city]
Dear Supplier,
We are requesting a quotation for steel reinforcement bar for a project in [city], Saudi Arabia.
- Standard / grade: [e.g. ASTM A615 Gr60 / BS 4449 B500B]
- Diameters and quantities:
[ 12 mm — __ tonnes ]
[ 16 mm — __ tonnes ]
[ 20 mm — __ tonnes ]
- Cut and bend required: [Yes — bar schedule attached / No, straight lengths]
- Delivery: [ex-works / delivered to site at [address]]
- Required delivery date: [date]
- Payment terms: [e.g. 30 days from delivery]
Please provide:
1. Unit price per tonne, stating ex-works or delivered
2. Cut-and-bend rate per tonne, if applicable
3. Offer validity period
4. Lead time from purchase order
5. Mill test certificate confirmation
Regards,
[Name] — [Company]What to ask for, and why
The numbered list at the bottom of the template is what makes replies comparable. Every line below is there because it is routinely left out of a quotation, and routinely decides which offer is genuinely the cheapest.
01Unit price per tonne, stating ex-works or delivered
Freight is a real share of landed cost over Saudi distances. Without the basis stated on the face of the quotation, a low ex-works price quietly beats a fair delivered one and you award the wrong supplier.
02Cut-and-bend rate per tonne, if applicable
Cut-and-bend is priced separately from the bar and is the line most often left out. A quotation that omits it is not comparable to one that includes it, and the gap only surfaces after award.
03Offer validity period
Rebar is a commodity with a moving price. A seven-day validity and a thirty-day validity are not the same offer, even at the same number, because one of them expires before your approval cycle finishes.
04Lead time from purchase order
Mills roll to a schedule. The cheapest tonne that lands three weeks after the pour date costs more than the dearest one that lands on time.
05Mill test certificate confirmation
Asked at quotation stage it is priced and committed. Asked at delivery it becomes an argument, and an uncertified lot on site is a lot you cannot pour.
Send it to every supplier at once.
Paste this into twenty separate emails, or let PROCAI send it once from your own Gmail or Outlook address and track every reply, bounce and non-responder against one RFQ. Sending RFQs never costs credits.
Start free — no credit cardQuestions buyers ask about Steel Rebar
Who manufactures steel rebar in Saudi Arabia?
Rebar in the Saudi market comes from a mix of domestic rolling mills and regional importers, and most projects buy through a stockist or trading arm rather than the mill directly. Rather than guess at a shortlist, run the search on your own specification — PROCAI returns the suppliers currently active for that grade and diameter range, with contact details.
How do I request a rebar quotation in Saudi Arabia?
State the standard and grade (ASTM A615 Gr60 or BS 4449 B500B), the diameters and tonnage per diameter, whether you need cut-and-bend against a bar schedule or straight lengths, the delivery point, and the required date. The copy-ready RFQ template on this page covers all of it — paste it, fill the brackets, and send it to every supplier at once.
What certification should Saudi rebar suppliers provide?
Ask for a mill test certificate against the quoted standard and SASO conformity for the delivered lot. Make certificate supply an explicit line in the RFQ so it is priced and committed at quotation stage rather than argued about on delivery.
Should I buy rebar ex-works or delivered?
Both, and ask for them separately. Rebar freight is a material share of the landed cost over Saudi distances, so a lower ex-works price can lose to a higher delivered one. Requesting the two prices in the same quotation is what makes the comparison like-for-like.
Which Saudi cities does this cover?
The supplier list is country-wide and includes suppliers delivering into Riyadh, Jeddah, Dammam, Al Khobar, Jubail, Mecca, Medina and Yanbu. When you run the search live you can name your delivery city and see who serves it.
Do these suppliers deliver rebar to {city}?
The list on this page was built by searching for rebar suppliers in and around {city} specifically, not nationally, so these are the mills, stockists and trading arms actually serving {city} projects. Delivery terms still vary by tonnage and site access — ask for the delivered price to your {city} address as a separate line from the ex-works price, which is what the RFQ template on this page does.
